1. Power plants 5
2. Structural steels from ArcelorMittal 8
4. Advantage of HISTAR® steels compared to conventional
structural steels 13
5. Optimised construction elements for power plant construction 21
6. Foundations for high loads 24
7. Sustainable construction with hot rolled steel sections 27
Annex A1 28
Comparison of S235 rolled sections with HISTAR 460 28
AnnexA2 29
Comparison of rolled sections with ACB beams 29
Annex 3 30
Comparison of box section with cross-shaped section 30
Steel Sections
in Power Plant Construction
5
1. Power plants
Introduction
The ever growing demand for energy, and
investments in new power plants which
have been postponed over many years, have
recently led to a remarkable boom in the
construction of power plants. This requires
the use of enormous amounts of steel and a
considerable amount of rolled sections. In the
area of coal power plants, the proportion of
rolled sections accounts for approx. 60% of
the total steel volume.
The need for short construction times and
rising labour costs make the use of rolled
sections attractive. With a wide range of
rolled sections, ArcelorMittal offers the right
solution for every opportunity.
Coal power plants
Figure 3 shows the functional units of a coal
power plant. Most notable in such power
plants are the large cooling towers and the
boiler frame structures, which, however, are
later enclosed by the boiler house.
But not only these large structures make
up a power plant. A number of dependent
buildings are necessary to accommodate all
the necessary units, such as the power house,
in which the generators are located, and the
bunker for temporary storage of coal.
Figure 2 shows the boiler frame structure of
a modern coal power plant. The staircases
have been designed as solid constructions
and will later provide access to all areas. In
the upper part of the boiler frame structure
the pre-installed boiler frame trusses can
be seen that will later reinforce the boiler
when in operation. In the bottom section in
front of the boiler frame structure, the upper
structure of the boiler house can be seen
which, together with the bottom part of the
boiler house, will fully surround the boiler
frame structure once lifted in its final position.
For this, a large number of rolled sections are
used.
حجم الكتاب عند التحميل : 3.2 ميجا بايت .
نوع الكتاب : pdf.
عداد القراءة:
اذا اعجبك الكتاب فضلاً اضغط على أعجبني و يمكنك تحميله من هنا:
شكرًا لمساهمتكم
شكراً لمساهمتكم معنا في الإرتقاء بمستوى المكتبة ، يمكنكم االتبليغ عن اخطاء او سوء اختيار للكتب وتصنيفها ومحتواها ، أو كتاب يُمنع نشره ، او محمي بحقوق طبع ونشر ، فضلاً قم بالتبليغ عن الكتاب المُخالف:
قبل تحميل الكتاب ..
يجب ان يتوفر لديكم برنامج تشغيل وقراءة ملفات pdf
يمكن تحميلة من هنا 'http://get.adobe.com/reader/'